4.3 Article

Mean-variance trade-offs in supply contracts

期刊

NAVAL RESEARCH LOGISTICS
卷 53, 期 7, 页码 603-616

出版社

WILEY
DOI: 10.1002/nav.20186

关键词

supply contracts; portfolio; capacity management

向作者/读者索取更多资源

We study the trade-offs faced by a manufacturer signing a portfolio of long-term contracts with its suppliers and having access to a spot market. The manufacturer incurs inventory risk when purchasing too many contracts and spot price risk when buying too few. We quantify these risks for a single selling period by studying the profit mean and variance for a given portfolio of option contracts. We characterize the set of efficient portfolios that the manufacturer must hold in order to obtain dominating mean-variance pairs. Among these, we emphasize the maximum expectation portfolio, obtained by solving the classical newsvendor problem, and the corresponding minimum variance portfolio. We show that the upper-level sets of a mean-variance utility function are connected. Hence, a greedy method will find the portfolios on the efficient frontier. Finally, we provide a comparison with standard hedging strategies and show that the approximation associated with financial hedging can be relatively inaccurate. (C) 2006 Wiley Periodicals, Inc.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据