期刊
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
卷 159, 期 -, 页码 221-222出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.ijpe.2014.09.022
关键词
Scheduling; Flow shop; Preventive maintenance; Availability constraint; Makespan
In Allaoui H., Lamouri S., Artiba A., Aghezzaf E., Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan. International journal of Production Economics 2008, 112, 161-167, several results are proposed. We show in this note that some of them are false. We also extend the analysis for some other results. (C) 2014 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据