4.6 Article

A note on Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan

期刊

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ijpe.2014.09.022

关键词

Scheduling; Flow shop; Preventive maintenance; Availability constraint; Makespan

向作者/读者索取更多资源

In Allaoui H., Lamouri S., Artiba A., Aghezzaf E., Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan. International journal of Production Economics 2008, 112, 161-167, several results are proposed. We show in this note that some of them are false. We also extend the analysis for some other results. (C) 2014 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据