4.7 Article

A bicriteria flowshop scheduling problem with setup times

期刊

APPLIED MATHEMATICS AND COMPUTATION
卷 183, 期 2, 页码 1292-1300

出版社

ELSEVIER SCIENCE INC
DOI: 10.1016/j.amc.2006.05.160

关键词

flowshop scheduling; bicriteria; setup times; integer programming; heuristic methods

向作者/读者索取更多资源

Most of research in production scheduling is concerned with the minimization of a single criterion. However, scheduling problems often involve more than one aspect and therefore require bicriteria analysis. In this study, bicriteria two-machine flowshop scheduling problem with setup times is considered. The objective function of the problem is minimization of the weighted sum of total completion time and total tardiness. An integer programming model is developed for the problem which belongs to NP-hard class. Only small size problems with up to 20 jobs can be solved by the proposed integer programming model. Heuristic methods are also used to solve large size problems. These heuristics are four tabu search based heuristics and random search method. According to computational results the tabu search based methods are effective in finding problem solutions with up to 1000 jobs. (c) 2006 Elsevier Inc. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据