EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 177, 期 3, 页码 2069-2099出版社
ELSEVIER
DOI: 10.1016/j.ejor.2005.12.019
关键词
genetic algorithms; scheduling; heuristics; supply chain management
The coordination of just-in-time production and transportation in a network of partially independent facilities to guarantee timely delivery to distributed customers is one of the most challenging aspect of supply chain management. From a theoretical perspective, the timely production/distribution can be viewed as a hybrid combination of planning, scheduling and routing problems, each notoriously affected by nearly prohibitive combinatorial complexity. From a practical viewpoint, the problem calls for a trade-off between risks and profits. This paper focuses on the ready-mixed concrete delivery: in addition to the mentioned complexity, strict time-constraints forbid both earliness and lateness of the supply. After developing a detailed model of the considered problem, we propose a novel meta-heuristic approach based on a hybrid genetic algorithm combined with constructive heuristics. A detailed case study derived from industrial data is used to illustrate the potential of the proposed approach. (c) 2005 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据