4.7 Article

A probabilistic bi-level linear multi-objective programming problem to supply chain planning

期刊

APPLIED MATHEMATICS AND COMPUTATION
卷 188, 期 1, 页码 786-800

出版社

ELSEVIER SCIENCE INC
DOI: 10.1016/j.amc.2006.10.032

关键词

bi-level programming; multi-objective decision-making; multi-level multi-objective decision-making; fuzzy decision-approach; stochastic programming; supply chain management

向作者/读者索取更多资源

Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels. In most of the real life problems in mathematical programming, the parameters are considered as random variables. The branch of mathematical programming which deals with the theory and methods for the solution of conditional extremum problems under incomplete information about the random parameters is called stochastic programming. Supply chain planning problems are concerned with synchronizing and optimizing multiple activities involved in the enterprise, from the start of the process, such as procurement of the raw materials, through a series of process operations, to the end, such as distribution of the final product to customers. Enterprise-wide supply chain planning problems naturally exhibit a multi-level decision network structure, where for example, one level may correspond to a local plant control/scheduling/planning problem and another level to a corresponding plant-wide planning/network problem. Such a multi-level decision network structure can be mathematically represented by using multi-level programming principles. In this paper, we consider a probabilistic bi-level linear multi-objective programming problem and its application in enterprise-wide supply chain planning problem where (1) market demand, (2) production capacity of each plant and (3) resource available to all plants for each product are random variables and the constraints may consist of joint probability distributions or not. This probabilistic model is first converted into an equivalent deterministic model in each level, to which fuzzy programming technique is applied to solve the multi-objective nonlinear programming problem to obtain a compromise solution. (C) 2006 Published by Elsevier Inc.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据