4.3 Article

Indian practice on estimation of scour around bridge piers - A comment

期刊

出版社

SPRINGER INDIA
DOI: 10.1007/s12046-007-0017-7

关键词

bridge elements; scour depth; design scour; Lacey-Inglis method

向作者/读者索取更多资源

Well-laid foundation is mostly provided in road and railway bridges in India over large and medium-sized rivers. The age-old Lacey-Inglis method is used for estimation of the design scour depth around bridge elements such as pier, abutment, guide bank, spur and groyene. Codal provisions are seen to produce too large a scour depth around bridge elements resulting in bridge sub-structures that lead to increased construction costs. Limitations that exist in the codes of practice are illustrated in this paper using examples. The methods recently developed for estimation of the scour are described. New railway and road bridges are required to be built in large numbers in the near future across several rivers to strengthen such infrastructure in the country. It is strongly felt that provisions in the existing codes of practice for determination of design scour depth require immediate review. The present paper provides a critical note on the practices followed in India for estimating the design scour depth.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据