期刊
ENVIRONMENTAL IMPACT ASSESSMENT REVIEW
卷 27, 期 5, 页码 365-385出版社
ELSEVIER SCIENCE INC
DOI: 10.1016/j.eiar.2007.02.001
关键词
cumulative; cumulative impact assessment; cumulative effect assessment; strategic environmental assessment; scale
Cumulative effects assessment (CEA) is (or should be) an integral part of environmental assessment at both the project and the more strategic level. CEA helps to link the different scales of environmental assessment in that it focuses on how a given receptor is affected by the totality of plans, projects and activities, rather than on the effects of a particular plan or project. This article reviews how CEAs consider, and could consider, scale issues: spatial extent, level of detail, and temporal issues. It is based on an analysis of Canadian project-level CEAs and UK strategic-level CEAs. Based on a review of literature and, especially, case studies with which the authors are familiar, it concludes that scale issues are poorly considered at both levels, with particular problems being unclear or non-existing cumulative effects scoping methodologies; poor consideration of past or Rely future human activities beyond the plan or project in question; attempts to apportion 'blame' for cumulative effects; and, at the plan level, limited management of cumulative effects caused particularly by the absence of consent regimes. Scale issues are important in most of these problems. However both strategic-level and project-level CEA have much potential for managing cumulative effects through better siting and phasing of development, demand reduction and other behavioural changes, and particularly through setting development consent rules for projects. The lack of strategic resource-based thresholds constrains the robust management of strategic-level cumulative effects. (c) 2007 Elsevier Inc. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据