期刊
FUSION ENGINEERING AND DESIGN
卷 82, 期 15-24, 页码 1846-1853出版社
ELSEVIER SCIENCE SA
DOI: 10.1016/j.fusengdes.2007.04.047
关键词
JET be tile design; power handling
The primary objective of the JET ITER-like wall project is to install a beryllium main wall and a tungsten divertor. For beryllium, melting and thermal stress limit the maximum power density which can be tolerated in operation. The tile design has to allow routine plasma operation for ITER relevant scenarios, i.e., q95 f approximate to[2.3-10] with high power input (P-in <= 30 MW) for pulse lengths of approximate to 10 s. This paper focuses on the power handling studies of the beryllium tiles for the outer poloidal limiters and ICRH horizontal protections, and the optimization of their design to achieve the operational goal described above. (C) 2007 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据