3.8 Article

Soft considerations in equipment selection for building construction projects

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9364(2007)133:10(749)

关键词

-

向作者/读者索取更多资源

This paper raises the issue of soft considerations in the selection of equipment for building construction projects. The paper aims at increasing the awareness: (1) to the nature, variety, and richness of soft factors; (2) to their significant role and potential impact on the outcome of decision making; and (3) to the inherent difficulty of evaluating them and integrating them within a comprehensive selection process. Existing state-of-the-art equipment selection models were analyzed and found to be inadequate in terms of both considering soft factors and providing mechanisms for their systematic evaluation. Six cases of large-size, complex construction projects were investigated to obtain an extensive list of typical soft factors. This investigation revealed that the consideration of soft factors in current practices is essentially unstructured and is not integrated within the selection process in a systematic manner. A desirable selection process is outlined that generally responds to the needs identified in the study. The proposition of a specific method for the quantitative treatment of soft factors and their tradeoff with cost factors is the subject of another paper.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据