Probabilistic control of project performance using control limit curves

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9364(2007)133:12(957)

关键词

-

向作者/读者索取更多资源

This study introduces a new probabilistic project control concept to assure an acceptable forecast of final project performance, in terms of not exceeding planned budget and schedule risk levels. This concept consists in the implementation of performance control limit curves for both actual cost and elapsed time, obtained with a probabilistic approach and a graphical representation referred to as Stochastic S curves (SS curves). In order to facilitate the project control process, control limit curves can be used to display and evaluate actual project performance status without the need of actualizing at completion performance forecasts. Three different approaches (quality, benchmarking, and incremental variance) are proposed in this paper for obtaining the project performance control limit curves. In order to find the control limit curve definition with more conservative acceptable performance variations, these approaches are tested in an example project. A further managerial advantage is found in the recommended approach, as it allows monitoring the use of both cost and scheduling contingencies, along the project execution.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据