4.7 Article

Causes of bleeding in a hot-in-place asphalt pavement

期刊

CONSTRUCTION AND BUILDING MATERIALS
卷 21, 期 12, 页码 2023-2030

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.conbuildmat.2007.06.008

关键词

hot-in-place recycling; rehabilitation; overlay; bleeding

向作者/读者索取更多资源

Hot-in-place recycling was used to rehabilitate a section of roadway in State highway. A 25-mm overlay was placed over the recycled layer. Shortly after construction, moderate to severe bleeding was observed in isolated areas throughout the recycled section. This study was carried out to investigate the potential causes of the bleeding of the pavement. The field observation and laboratory tests were conducted. The laboratory tests were performed using core samples taken from the bleeding and non-bleeding areas of the pavement. The test results showed that the bleeding was associated with the surface layer and tack coat. This paper demonstrates that hot-in-place recycling is viable method for correcting distress asphalt pavement. (c) 2007 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据