The tricriteria flowshop scheduling problem

期刊

出版社

SPRINGER LONDON LTD
DOI: 10.1007/s00170-007-0931-1

关键词

flowshop scheduling; tricriteria; integer programming; heuristic methods

向作者/读者索取更多资源

Multicriteria flowshop scheduling problems have been one of the most attractive subjects in recent years. In the multicriteria flowshop scheduling literature, a very limited number of studies have been performed on problems which include a tardiness criterion. In this paper a multicriteria (tricriteria) two-machine flowshop scheduling problem with a tardiness criterion is tackled. The objective is to minimise a weighted sum of total completion time, total tardiness and makespan. An integer programming model is proposed for the problem which belongs to NP-hard class. The modified NEH (Nawaz, Enscore and Ham) algorithm, a tabu search-based heuristic method, random search and the EDD rule (the earliest due date rule) are used to solve problems with up to 2,500 jobs. A computational analysis is conducted to evaluate the performance of the heuristics. The analysis shows that the heuristics are quite efficient, and the performance of the tabu search based heuristic is the best of all in terms of solution quality.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据