3.8 Article

The analysis of ground vibrations induced by bench blasting at Akyol quarry and practical blasting charts

期刊

ENVIRONMENTAL GEOLOGY
卷 54, 期 4, 页码 737-743

出版社

SPRINGER
DOI: 10.1007/s00254-007-0859-7

关键词

blasting; ground vibration; practical blasting chart

向作者/读者索取更多资源

Ground vibrations arising from excavation with blasting is one of the fundamental problems in the mining industry. Therefore, the prediction of ground vibration components plays an important role in the minimization of environmental complaints. In this study, 582 events were recorded during limestone production at a quarry (Akyol Quarry) during a period of time. The blasting parameters of these shots were also carefully recorded. During the statistical analysis of the collected data, three predictor equations proposed by the United States Bureau of Mines (USBM), Ambraseys-Hendron and Langefors-Kihlstrom were used to establish a relationship between peak particle velocity and scaled distance described by these prediction equations. As a result of this analysis, the most powerful relationship was determined and proposed to be used in this site. And also, this equation was used in the derivation of the practical blasting charts specific to this site as a practical way of predicting the peak particle velocity and maximum charge amount per delay for future blasting.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据