4.1 Article

Assessment and Control of Ore Dilution in Long Hole Mining: Case Studies

期刊

GEOTECHNICAL AND GEOLOGICAL ENGINEERING
卷 26, 期 4, 页码 349-366

出版社

SPRINGER
DOI: 10.1007/s10706-008-9172-9

关键词

Parametric numerical modeling; Ore dilution; Rock mechanics; Underground mining; Hanging-wall reinforcement; Stope type; Stope case study

向作者/读者索取更多资源

Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents the results of an examination of factors influencing ore dilution in a blasthole stoping environment. For the study, a comprehensive database was established, incorporating information related to the design, construction, excavation and cavity surveys of 172 sequentially mined long hole stope case histories from two orezones. Through a review of the case studies, it was demonstrated that, in addition to stope dimension, the amount of unplanned dilution differed according to stope type. Five stope types were identified, based on their position within a tabular blasthole mining sequence. Measured overbreak varies with stope type, with secondary stopes generating a greater volume of hanging-wall dilution than do primary stopes. Furthermore, a case study is presented to demonstrate the role cablebolts installed in the stope hanging-wall play to control ore dilution. The study illustrates relationships between measured hanging-wall overbreak, cablebolt orientation and stope type.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.1
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据