4.6 Article

Integrated scheduling and dynamic optimization of batch processes using state equipment networks

期刊

AICHE JOURNAL
卷 58, 期 11, 页码 3416-3432

出版社

WILEY
DOI: 10.1002/aic.13738

关键词

batch processes; scheduling; dynamic optimization; MINLP; collocation

向作者/读者索取更多资源

A systematic framework for the integration of short-term scheduling and dynamic optimization (DO) of batch processes is described. The state equipment network (SEN) is used to represent a process system, where it decomposes the process into two basic kinds of entities: process materials and process units. Mathematical modeling based on the SEN framework invokes both logical disjunctions and operational dynamics; thus the integrated formulation leads to a mixed-logic dynamic optimization (MLDO) problem. The integrated approach seeks to benefit the overall process performance by incorporating process dynamics into scheduling considerations. The solution procedure of an MLDO problem is also addressed in this article, where MLDO problems are translated into mixed-integer nonlinear programs using the Big M reformulation and the simultaneous collocation method. Finally, through two case studies, we show advantages of the integrated approach over the conventional recipe-based scheduling method. (c) 2012 American Institute of Chemical Engineers AIChE J, 2012

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据