PUBLIC WORKS MANAGEMENT & POLICY
卷 15, 期 1, 页码 20-31出版社
SAGE PUBLICATIONS INC
DOI: 10.1177/1087724X10364535
关键词
contract payment provisions; lump sum; cost plus fee; design-bid-build; design-build; water infrastructure
资金
- Water Design-Build Council [CEAE-WDBC-2007]
In a continued effort to provide water and wastewater facilities, owners have been using a variety of contract pricing methods for the construction of new facilities. Increasing use of cost-plus-fee with a guaranteed maximum price (GMP) contract payment provisions along with the more traditional lump sum contract payment provisions has created a need to measure the effectiveness of these contract pricing methods. Through a detailed survey of public water and wastewater facility owners, performance data were collected to compare project performance based on schedule and cost growth measures. The results of this study indicate that contracts using cost-plus-fee with a GMP contract pricing provisions are more likely to have no schedule or cost growth as compared to projects with lump-sum provisions. Overall, the results of this study provide new data for water and wastewater projects that can be used by owners to improve future project performance.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据