4.4 Article

Flexible transmission expansion planning associated with large-scale wind farms integration considering demand response

期刊

IET GENERATION TRANSMISSION & DISTRIBUTION
卷 9, 期 15, 页码 2276-2283

出版社

INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-gtd.2015.0579

关键词

power transmission planning; wind power plants; power grids; probability; load forecasting; demand side management; Monte Carlo methods; power transmission reliability; flexible transmission expansion planning; large-scale wind farms integration; power grid; uncertainty factor; probabilistic TEP model; grid connected wind farm; load forecasting; wind power; forced outage rate; transmission line; generator; wind speed correlation; incentive-based demand response; IBDR; network expansion approach; transmission investment; Bender decomposition algorithm; Monte Carlo simulation; Garver six-bus system; IEEE-reliability test system

资金

  1. China Scholarship Council

向作者/读者索取更多资源

With increasing large-scale wind farms being integrated into the power grids, transmission expansion planning (TEP) increasingly requires more flexibility to account for the intermittency as well as other uncertainty factors involved in the process. In this study, a probabilistic TEP model is proposed for planners to tackle the variability and uncertainty factors associated with grid connected wind farms. Both load forecast and wind power output uncertainties are considered in the proposed model. Other factors considered in the model include the forced outage rates of transmission lines and generators, and the wind speed correlation between wind farms. Moreover, the incentive-based demand response (IBDR) program is introduced as a non-network solution instead of the conventional network expansion approaches. The utilities will pay IBDR providers for their contributions to peak demand reduction. The proposed TEP model can find the optimal trade-off between transmission investment and demand response expenses. The hierarchical Bender's decomposition algorithm integrated with Monte Carlo simulation is employed to solve the proposed model. Case studies are given using the Garver's six-bus system and the IEEE-reliability test system to show the effectiveness of the method.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据