4.5 Article

The effects of project uncertainty and risk management on IS development project performance: A vendor perspective

期刊

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
卷 29, 期 7, 页码 923-933

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ijproman.2010.11.002

关键词

Contingency approach; Outsourced IS development projects; Project uncertainty; Risk management; Moderating effects; Project performance; Partial Least Square (PLS)

向作者/读者索取更多资源

The structural contingency perspective has been widely used in information systems development (ISD) project risk management research. This paper develops an integrative model to explore the moderating effects of uncertainty on the relationship between risk management and IS development project performance from a vendor perspective, rather than the client perspective that is mainly employed in the literature. A survey-based research design is used to collect data to test the proposed model. The results reveal that project uncertainty can moderate the effects of project planning and control on process performance and the effects of user participation on product performance. More specifically, the results indicate that project planning and control makes a greater contribution to process performance when there is a low level of inherent uncertainty and that user participation makes a greater contribution to product performance when there is a high level of inherent uncertainty. The results of this study contribute to a more acute understanding of the contingency approach to ISD project risk management. (C) 2010 Elsevier Ltd. and IPMA. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据