相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources
Zdenek Hanzalek et al.
ANNALS OF OPERATIONS RESEARCH (2017)
An improved robust buffer allocation method for the project scheduling problem
Parviz Ghoddousi et al.
ENGINEERING OPTIMIZATION (2017)
An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
M. E. Bruni et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2017)
Data-Enabled Stochastic Modeling for Evaluating Schedule Robustness of Railway Networks
Harshad Khadilkar
TRANSPORTATION SCIENCE (2017)
A Robust Solution to Resource-Constraint Project Scheduling Problem
Milad Keshavarz Kord Mahalleh et al.
INTERNATIONAL JOURNAL OF FUZZY LOGIC AND INTELLIGENT SYSTEMS (2017)
Resource constrained project scheduling with uncertain activity durations
Ripon K. Chakrabortty et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2017)
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
Patricio Lamas et al.
JOURNAL OF SCHEDULING (2016)
Resource-constrained project scheduling problem with uncertain durations and renewable resources
Weimin Ma et al.
INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS (2016)
Incorporation of activity sensitivity measures into buffer management to manage project schedule risk
Xuejun Hu et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2016)
Optimal Delays, Safe Floats, or Release Dates? Applications of Simulation Optimization in Stochastic Project Scheduling
Ali Mohaghar et al.
3RD GLOBAL CONFERENCE ON BUSINESS, ECONOMICS, MANAGEMENT AND TOURISM (2016)
Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
Haitao Li et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2015)
Effective expediting to improve project due date and cost performance through buffer management
Xuejun Hu et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2015)
Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment
Wendi Tian et al.
ANNALS OF OPERATIONS RESEARCH (2014)
A new concept of project robust schedule - use of buffers
Dorota Kuchta
2ND INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT, ITQM 2014 (2014)
A robust scheduling of projects with time, cost, and quality considerations
Ali Salmasnia et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2012)
New Proactive Time Buffer Heuristics for Robust Project Scheduling
Raafat Elshaer et al.
JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING (2012)
Resource allocation for robust project scheduling
M. Klimek et al.
BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES (2011)
A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
E. Klerides et al.
COMPUTERS & OPERATIONS RESEARCH (2010)
Solve-and-robustify Synthesizing partial order schedules by chaining
Nicola Policella et al.
JOURNAL OF SCHEDULING (2009)
Proactive heuristic procedures for robust project scheduling: An experimental analysis
Stijn Van de Vonder et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
The use of buffers in project management: The trade-off between stability and makespan
S Van de Vonder et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)
Insertion techniques for static and dynamic resource-constrained project scheduling
C Artigues et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2003)