3.8 Proceedings Paper

Factors Influencing the Construction Cost of Industrialised Building System (IBS) Projects

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.sbspro.2012.02.138

关键词

Industrialised Building System (IBS); construction cost; Relative Importance Index (RII); cost estimation

资金

  1. Ministry of Higher Education of Malaysia
  2. Research Management Institute (RMI) of Universiti Teknologi MARA
  3. Fundamental Research Grant (FRGS)

向作者/读者索取更多资源

This paper presents the results of a survey of factors influencing the construction costs of Industrialised Building System (IBS) projects in Malaysia. The aim of the study was to evaluate and rank a range of factors that Malaysian IBS stakeholders regard as important, with the key identified factors being those associated with the main project characteristics, contract procedures and procurement methods, contractors' and consultants' attributes and design parameters besides external market conditions. Remarkably, factors grouped under the consultants and design parameters, external factors and government/authority requirements indicate low RII index while project/IBS characteristics, contractor attributes, external market conditions denote high RII index. (C) 2012 Published by Elsevier B.V. Selection and/or peer-review under responsibility of Centre for Environment-Behaviour Studies(cE-Bs), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据