3.9 Article

Integration of Wind and Hydropower Systems: Results of IEA Wind Task 24

期刊

WIND ENGINEERING
卷 36, 期 1, 页码 1-17

出版社

SAGE PUBLICATIONS LTD
DOI: 10.1260/0309-524X.36.1.1

关键词

-

向作者/读者索取更多资源

In May of 2004, the IEA Wind Implementing Agreement (IA) established R&D Task 24, Integration of Wind and Hydropower Systems. Australia, Canada, Finland, Norway, Sweden, Switzerland, and the United States joined Task 24 with the goal of collaborating in the study of wind integration in a variety of electrical system configurations (load, generation, and transmission); hydro system configurations and characteristics; and market and operational configurations. Representing these countries were utilities and research organizations with the intent to understand the potential for and limiting factors in integrating wind into systems with hydropower. Case studies that analyze the feasibility, benefits, detriments, and costs of specific wind-hydro integration projects were the mechanism through which the goals of the task were addressed. The purpose of this article is to summarize the framework within which these studies were performed, and to present the key results and the general conclusions of the Task.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.9
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据