4.6 Article

Hybrid Approach to Construction Project Risk Management with Simultaneous FMEA/ISO 31000/Evolutionary Algorithms: Empirical Optimization Study

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0001486

关键词

Risk management; Risk response strategy; Mixed-integer programming; Evolutionary algorithms

资金

  1. P.G. Company

向作者/读者索取更多资源

Uncertainty and risks have been the inherent characteristics of large-scale projects. Although practitioners have applied different project risk management standards, numerous uncertainties, and risks in large-scale construction projects have led to significant failures in fulfilling a project's goals. Therefore, in this study, a hybrid approach based on failure mode effects analysis (FMEA)/ISO 31000 has been proposed to identify, evaluate, and control the problem effectively. This hybrid approach is not a very accurate approach in providing an appropriate risk response; hence, a mixed-integer programming (MIP) model has been proposed to select the optimized risk response strategies for the project. In the present study, a model based on synergies among project risk responses was developed that is capable of considering the various criteria in the objective function and optimizing them based on the defined projects. Risk response selection for a large-scale project is a complex problem. Because of the nondeterministic polynomial time (NP)-hardness of the presented model, two metaheuristic algorithms, namely, the self-adaptive imperialist competitive algorithm and invasive weed optimization, were developed to solve the proposed MIP model. A large-scale high-rise residential building was evaluated as a case study to investigate the model proposed in this study empirically.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据