STRUCTURAL ENGINEERING INTERNATIONAL
卷 28, 期 2, 页码 178-184出版社
IABSE
DOI: 10.1080/10168664.2018.1453760
关键词
suspension and cable-stayed cooperation system; self-balance; non-falsework construction; configuration transformation control; process analysis
资金
- Natural Science Foundation of Shaanxi Province [2017JQ5013]
- Fundamental Research Funds for the Central Universities of China [310821172006]
Dongtiao River Bridge in Huzhou, China is a new type of bridge based on a spatial cable self-anchored suspension and cable-stayed cooperation system. A temporary pylon-girder anchorage method is proposed in order to build a girder without falsework and thus avoid interruptions to the operation of the shipping channel. A temporary crossbar method is developed to transform the configuration of the cable system from a plane to a 3D curve, thus preventing buckling damage to hangers in the hanging girder segments. With the unique characteristics of the structure system and the innovative construction method, self-anchored cable-supported bridges can be improved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据