4.7 Article

Assessment of copper and zinc recovery from MSWI fly ash in Guangzhou based on a hydrometallurgical process

期刊

WASTE MANAGEMENT
卷 76, 期 -, 页码 225-233

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.wasman.2018.02.040

关键词

MSW incineration; Fly ash; Metal recovery; Process assessment; Copper; Zinc

资金

  1. Guangzhou University
  2. Nature Science Foundations of China [51208122, 51778156, 51708143]
  3. Science and Technology Program of Guangzhou [201707010256]
  4. High Level University Construction Project (Regional Water Environment Safety and Water Ecological Protection)
  5. Guangzhou University's Training Program for Excellent New-recruited Doctors [YB201710]

向作者/读者索取更多资源

Fly ash commonly accumulates a significant amount of heavy metals and most of these heavy metals are toxic and easily leached out to the environment, posing risks to human health. Thus, fly ash has been classified as a type of hazardous waste and requires proper treatment before disposal in specific landfill sites for hazardous waste. In this study, a hydrometallurgical process developed to recover copper and zinc performed in pilot scale close to industrial scale followed by a landfill compliance leaching test of the ash residue is evaluated. LIX860N-I and Cyanex 572 gave high selectively for extractions, a yield efficiency of 95% and 61% was achieved for copper and zinc respectively. Results of pilot experiments reveals that the combining metal recovery recycling and landfill disposal of the ash residue in a local regular landfill was demonstrated to be a technically and economically effective strategy. Specifically, the economic and environmental aspects of a scenario, in which the fly ash generated in Guangzhou is processed were systematically assessed. the assessment results show that a 7.15 million US$ of total expense reduction, a less energy cost of 19k GJ as well as 2100 tons less CO2 emissions could be achieved annually comparing to the current alternative, direct disposal of the fly ash as hazardous waste. The results reveal that the hydrometallurgical process has industrial application potential on both economic and environmental aspects and further optimization of the process can give more accurate assessment of the cost and environment effect. In addition, leaching tests and evaluation of solid residue according to the regulations specific to the country should be studied in future. (C) 2018 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据