4.6 Article

Life cycle assessment of the 3.2 kW cadmium telluride (CdTe) photovoltaic system in composite climate of India

期刊

SOLAR ENERGY
卷 159, 期 -, 页码 415-422

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.solener.2017.10.087

关键词

Performance assessment; Photovoltaic systems; Life cycle assessment; CdTe; Carbon credit; Energy payback time

资金

  1. Ministry of New and Renewable Energy (Government of India)

向作者/读者索取更多资源

Life cycle assessment for new emerging photovoltaic (PV) technology is an important tool to establish a PV system in field condition. In this paper, life cycle assessment of the 3.2 kW cadmium telluride (CdTe) PV system has been carried out on the basis of actual field performance data in a composite climate of India. Further, analysis has been performed on the basis of the energy metrics, life cycle assessment, per unit cost of electricity and carbon credit earned. The analysis of the PV system has been performed under the same environmental conditions likely solar irradiation, ambient temperature and wind speed, etc. Energy payback time (EPBT), energy production factor (EPF) and life cycle conversion efficiency (LCCE) of the PV system has been found to be 3.60 years, 0.27 and 0.0018 respectively. The unit cost of electricity of the PV system has been calculated as 9.85 INR/kW h for 5% interest rate and 30 years life span.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据