4.5 Article

Application of polyurethane geocomposites to help maintain track geometry for high-speed ballasted railway tracks

期刊

JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A
卷 13, 期 11, 页码 836-849

出版社

ZHEJIANG UNIV
DOI: 10.1631/jzus.A12ISGT3

关键词

Railways; Polyurethanes; Geocomposites; Modelling; High-speed

资金

  1. Engineering and Physical Sciences Research Council, UK [EP/H027262/1]

向作者/读者索取更多资源

There are many issues surrounding the performance of critical assets on high-speed ballasted railway lines. At assets like switch & crossings and bridge transitions high track forces can be produced resulting in higher ballast settlements and hence track misalignments. The latter result in higher track forces and hence more settlement, leading to the need for increased track maintenance to ensure comfort and safety. Current technologies for solving issues like ballast movement under high-speed loading regimes are limited. However, a technique that has been well used across the UK and now increasingly overseas to stabilise and reinforce ballasted railway tracks is the application of in-situ polyurethane polymers, termed XiTRACK. This paper discusses how this technique can be used to solve these types of long-standing issues and presents actual polymer application profiles at two typical critical sites, namely a junction and a transition onto concrete slab-track.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据