4.7 Article

Generation scheduling in non-interconnected islands with high RES penetration

期刊

RENEWABLE ENERGY
卷 115, 期 -, 页码 338-352

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.renene.2017.08.050

关键词

Island systems; Autonomous power systems; Unit commitment; Generation scheduling; High RES integration; Wind penetration

资金

  1. Alexander S. Onassis Public Benefit Foundation [G ZL 087-1/2015-2016]

向作者/读者索取更多资源

In this paper, the generation scheduling problem for autonomous island systems with significant penetration of non-dispatchable Renewable Energy Source (RES) generation is investigated, proposing a unit commitment-economic dispatch (UC-ED) model which is fully compatible with the provisions of the regulatory framework currently applicable to the Greek non-interconnected island (NII) systems. Two UC-ED model variants are presented and comparatively assessed, in order to illustrate the impact of various system parameters (technical characteristics of the thermal units, reserve requirements, etc.) on the expected operating profile of the Nil system. A detailed UC-ED model is first proposed, which takes into account the reserve requirements at different time scales (primary, secondary and tertiary reserves) and respective capabilities of generating units. An alternative, simplified UC-ED model is also presented, formulated on the basis of aggregate spinning reserves, to cater for uncertainties in the actual reserve capabilities of existing thermal units. The developed UC-ED models are applied to an existing NII system to evaluate their performance and results obtained on an annual basis. (C) 2017 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据