Project scheduling for constructing biogas plant using critical path method

期刊

RENEWABLE & SUSTAINABLE ENERGY REVIEWS
卷 81, 期 -, 页码 756-759

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.rser.2017.08.025

关键词

Biogas plant; Construction; Critical path method; Project management; Scheduling

向作者/读者索取更多资源

Population growth and technological progress have led to increased energy demand. While fossil fuels are currently the main energy resources, they are limited and their combustion causes environmental pollution. Therefore, alternative energy sources should be considered. For this purpose, biogas can be a convenient renewable energy option, which can be produced from organic wastes, e.g. livestock manure and rural wastes which are widely available and accessible. Furthermore, it is considered as a convenient option for rural areas that do not have access to any gas networks. However, managing a large-scale biogas plant construction project demands many coordinated activities with varying durations and involves numerous dependencies. Therefore, this study focuses on application of planning and scheduling for analysis of biogas plant construction project using critical path method (CPM). The results revealed that the minimum completion time of constructing a 50 m(3) biogas plant with fixed dome in Iran would be 38 weeks if no delays postpone the project steps. Also, a project network is proposed to show the relationships between the activities and monitor the progress of the project.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据