4.5 Article

Forecasting UK Industrial Production with Multivariate Singular Spectrum Analysis

期刊

JOURNAL OF FORECASTING
卷 32, 期 5, 页码 395-408

出版社

WILEY
DOI: 10.1002/for.2244

关键词

singular spectrum analysis; forecasting; causality; industrial production series

向作者/读者索取更多资源

In recent years the singular spectrum analysis (SSA) technique has been further developed and applied to many practical problems. The aim of this research is to extend and apply the SSA method, using the UK Industrial Production series. The performance of the SSA and multivariate SSA (MSSA) techniques was assessed by applying it to eight series measuring the monthly seasonally unadjusted industrial production for the main sectors of the UK economy. The results are compared with those obtained using the autoregressive integrated moving average and vector autoregressive models. We also develop the concept of causal relationship between two time series based on the SSA techniques. We introduce several criteria which characterize this causality. The criteria and tests are based on the forecasting accuracy and predictability of the direction of change. The proposed tests are then applied and examined using the UK industrial production series. Copyright (c) 2012 John Wiley & Sons, Ltd.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据