Putting pylons into place: a UK case study of public perspectives on the impacts of high voltage overhead transmission lines

期刊

出版社

ROUTLEDGE JOURNALS, TAYLOR & FRANCIS LTD
DOI: 10.1080/09640568.2012.716756

关键词

high voltage overhead transmission lines (HVOTL); not-in-my-back-yard (NIMBY); public consultation; Infrastructure Planning Commission (IPC); infrastructure siting

向作者/读者索取更多资源

The siting of high voltage overhead transmission lines (HVOTLs) is often subject to public opposition where affected communities seek to protect local places. This study explores the perspectives of local citizens affected by a proposed HVOTL to connect new nuclear power at Hinkley Point in Southwest England. A two-day public workshop was held with 38 participants in an affected line-site community, using deliberative focus group methods to explore perceptions of environmental and social impacts, risks, governance arrangements and technology choices. The findings show how potential health effects from electric and magnetic fields (EMF) and visual impacts are perceived to industrialise rural places, disrupt place attachments and provoke local opposition. The findings challenge the not-in-my-back-yard' assumption that citizens are selfish place-protectionists that lack the technical sophistication necessary to take a strategic viewpoint on transmission system development. They also reveal how decision making under the former UK Infrastructure Planning Commission's (IPC) (and its successor body the Planning Inspectorate) presents a challenge to procedural justice, as front-loaded developer-led consultation practices curtail citizen input to key decisions on alternative technologies (for example, underground or undersea lines). This is likely to exacerbate public mistrust of transmission system operators and provoke further organised protest.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据