4.7 Article

Monitoring and analysis of long-term prestress losses in post-tensioned concrete beams

期刊

MEASUREMENT
卷 122, 期 -, 页码 573-581

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.measurement.2017.07.057

关键词

Long-term prestress loss; Post-tensioned concrete beam; Monitoring; Prediction model; Shrinkage; Creep

资金

  1. National Key Research Program of China [2016YFC0701400]
  2. Open Foundation of National Engineering Laboratory for High Speed Railway Construction [HSR2013029]
  3. Fok Ying Tung Education Foundation [131074]
  4. Priority Academic Program Development of Jiangsu Higher Education Institutions [CE02-1-38]

向作者/读者索取更多资源

In order to investigate the long-term prestress losses in post-tensioned concrete beams, time-dependent responses of eight post-tensioned concrete beams were monitored for more than one year. Load cells, vibrating wire strain gauges (VWSGs) and elasto-magnetic (EM) sensors were used jointly to measure the tendon forces at beam ends, the prestress losses due to concrete creep and shrinkage and the total prestress losses along tendons, respectively. In this way, the prestress losses due to different factors and at different locations were observed more accurately. Based on the monitored data, the influence of tendon layout, reinforcement ratio, duct grouting, stress level and jacking sequence, etc., on long-term prestress losses were analyzed. An improved model for predicting the time-dependent prestress losses was thus proposed, in which non-prestressed steel and the interaction among the shrinkage, creep of concrete and steel stress relaxation were taken into account. The proposed model has higher accuracy as compared with existing models in specifications, and the maximum difference between test and predicted results is within 10%.