4.7 Article

A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams

期刊

RESOURCES POLICY
卷 38, 期 4, 页码 591-597

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.resourpol.2013.09.008

关键词

Stochastic optimization; Cutoff grade; Heuristic algorithms; Open pit mine planning

向作者/读者索取更多资源

Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/refining capacity constraints. Even though, the quantities of material flowing from the mine to the market are influenced by the expected variation in the available metal content or inherent uncertainty in the supply of ore, the majority of cutoff grade optimization models not only disregard this aspect and may lead to unrealistic cash flows, but also they are limited in application to an open pit mining operation with single processing facility. The model proposed herein determines the optimal cutoff grade policy based on a stochastic framework that accounts for uncertainty in supply of ore to the multiple ore processing streams. An application on a large-scale open pit mining operation develops a unique cutoff grade policy along with a portfolio of mining, processing, and marketing/refining rates. Owing to the geological uncertainty, the approach addresses risk by showing a difference of 14% between the minimum and maximum production rates, cash flows and NPV. (C) 2013 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据