4.2 Article

Temporal Development of Propeller Scour around a Sloping Bank

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)WW.1943-5460.0000465

关键词

Propeller scour; Sediment transport; Temporal development

资金

  1. Nanyang Technological University

向作者/读者索取更多资源

This study presents results of the temporal development of propeller scour around a sloping bank. During the scouring process, the centerline scour profile along the propeller axis comprises a toe scour hole, a primary scour hole, or a combination of both. Their formation is dependent on the length of the toe clearances, which is defined as the longitudinal distance between the propeller face and toe of the slope. As a result, the overall maximum scour depth along the centerline profile may occur either in the primary or toe scour hole. The results show that the temporal development of the overall maximum scour depth for all the cases consistently exhibits an exponential form. An empirical method was obtained to estimate the maximum scour depth evolution throughout the scouring process.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据