期刊
JOURNAL OF TESTING AND EVALUATION
卷 46, 期 5, 页码 2083-2099出版社
AMER SOC TESTING MATERIALS
DOI: 10.1520/JTE20160617
关键词
shield tunneling; annular gap; two-component grout; tests of grout
How to fill the empty annular space behind the segmental lining of tunnels is considered one of the most important questions in mechanized excavation, of which the main aim is to minimize settlement on the earth surface. In addition, the grout is the agent that creates a suitable bed for the segment lining of the tunnel and helps with its tightening. There are different methods of filling the empty space. One of them, using excavation by Earth Pressure Balance-Tunnel Boring Machine (EPB-TBM), is the injection of two-component grout at suitable pressure to the back of the segment as the shield of the excavator moves ahead. The grout utilized has suitable mechanical characteristics and efficiency. The main properties of grout refer to bleeding, fluidity and the results of the Marsh funnel test (ability to pump grout), setting time, gelling time (to avoid grout washing out) and compressive strength of grout (to minimize settlement on the earth level). The present study attempts to review the effect of any constituent materials of two-component grout on the parameters. Consequently, different tests with various constituent materials on the properties of grout were conducted.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据