3.8 Proceedings Paper

Performance Verification of the DKIST Mount and Coude Laboratory

期刊

出版社

SPIE-INT SOC OPTICAL ENGINEERING
DOI: 10.1117/12.2055739

关键词

ATST; DKIST; structural optimization; friction; end-to-end simulation; factory acceptance

向作者/读者索取更多资源

The former Advanced Technology Solar Telescope (ATST), now renamed to Daniel K. Inouye Solar Telescope (DKIST) will be the largest solar telescope in the world - with a 4m aperture primary mirror and a 16m diameter co-rotating Coude laboratory located within the telescope pier. Both, the telescope mount and the Coude laboratory use for their azimuth axis a new kind of bearing technology, so called R-guides, which minimize later maintenance efforts, avoid energy consumption and the risk of oil spill of conventional hydrostatic bearings. The paper describes the integrated modeling approach for the verification of the challenging DKIST jitter requirement of 0.075 arcsec rms with the new bearing system, including initial system engineering guidelines, finite element evaluations, system dynamics and end-to-end jitter simulations, factory tests of subsystems and components, and the commissioning of the trial assembled Coude table and later the telescope mount.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据