4.4 Article

Approaching activity duration in PERT by means of fuzzy sets theory and statistics

期刊

JOURNAL OF INTELLIGENT & FUZZY SYSTEMS
卷 26, 期 2, 页码 577-587

出版社

IOS PRESS
DOI: 10.3233/IFS-120751

关键词

Project management; scheduling; fuzzy probability; fuzzy statistics

向作者/读者索取更多资源

Taking into account the intrinsic drawbacks of both classic and fuzzy PERT, the authors present a new approach in an attempt to deal with them. The tools for this approach are fuzzy statistics and fuzzy probabilities. A necessary condition for this approach is the existence of statistical data for the project activity duration. The final findings are the fuzzy activity times (earliest/latest start - earliest/latest finish), the fuzzy float, the Criticality Degree both for each activity and for each path, a fuzzy probability for the activity duration to be in a certain time interval and a fuzzy probability for the project completion time to be in certain time interval. A numerical example is provided for thorough comprehension.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据