An order acceptance strategy under limited engineering man-hours for cost estimation in Engineering-Procurement-Construction projects

期刊

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
卷 32, 期 3, 页码 519-528

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ijproman.2013.07.009

关键词

Engineering and construction; Bidding; Cost estimation; Man-hour constraint

资金

  1. Grants-in-Aid for Scientific Research [26242027] Funding Source: KAKEN

向作者/读者索取更多资源

Accurate cost estimation is essential for any Engineering Procurement Construction (EPC) contractor accepting profitable projects because the project price is determined prior to receiving the contract. Therefore the contractor needs to ensure engineering man-hours (MH) in order to estimate project costs accurately as well as carry out the accepted orders. In this paper, we develop MH based order acceptance strategies and investigate their effects on the total expected profit through a long-term operation in EPC projects under a competitive bidding situation. To this end we build a simulation model describing relations among the volume of MH for cost estimation, accepted orders, revenues, and profits in EPC projects. Using our model, we show that the strategy, which maintains the appropriate balance of MH for cost estimation and project execution under the variability of accepted orders with competitive bidding situations, improves the total expected profit in EPC projects. (C) 2013 Elsevier Ltd. APM and IPMA. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据