Modeling construction time in Spanish building projects

期刊

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
卷 32, 期 5, 页码 861-873

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ijproman.2013.09.009

关键词

Forecasting; Time; Building projects; Construction speed; Construction cost; Regression analysis

向作者/读者索取更多资源

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs. (C) 2013 Elsevier Ltd. APM and IPMA. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据