4.4 Article

Production Costs of Field-grown Cercis canadensis L. 'Forest Pansy' Identified during Life Cycle Assessment Analysis

期刊

HORTSCIENCE
卷 49, 期 5, 页码 622-627

出版社

AMER SOC HORTICULTURAL SCIENCE
DOI: 10.21273/HORTSCI.49.5.622

关键词

field-grown trees; life cycle assessment; production costs

资金

  1. Horticulture Research Institute, Washington, DC

向作者/读者索取更多资源

University researchers have recently quantified the value of carbon sequestration provided by landscape trees (Ingram, 2012, 2013). However, no study to date has captured the economic costs of component horticultural systems while conducting a life cycle assessment of any green industry product. This study attempts to fill that void. The nursery production system modeled in this study was a field-grown, 5-cm (2-in) caliper Cercis canadensis 'Forest Pansy' in the Lower Midwest. Partial budgeting modeling procedures were also used to measure the sensitivity of related costs and potential benefits associated with short-run changes in cultural practices in the production systems analyzed (e.g., transport distance, post-harvest activities, fertilization rates, and plant mortality). Total variable costs for the seedling and liner stages combined amounted to $2.93 per liner, including $1.92 per liner for labor, $0.73 for materials, and $0.27 per liner for equipment use. The global warming potential (GWP) associated with the seedling and liner stages combined included 0.3123 kg of carbon dioxide equivalents (CO(2)e) for materials and 0.2228 kg CO(2)e for equipment use. Total farm-gate variable costs (the seedling, liner, and field production phases combined) amounted to $37.74 per marketable tree, comprised of $9.90 for labor, $21.11 for materials, and $6.73 for equipment use, respectively. However, post-harvest costs (e.g., transportation, transplanting, take-down, and disposal costs) added another $33.78 in labor costs and $27.08 in equipment costs to the farm-gate cost, yielding a total cost from seedling to end of tree life of $98.60. Of this, $43.68 was spent on labor, $21.11 spent on materials, and $33.81 spent on equipment use during the life cycle of each marketable tree. As per an earlier study, the life cycle GWP of the described redbud tree, including greenhouse gas emissions during production, transport, transplanting, take-down, and disposal, would be a negative 63 kg CO(2)e (Ingram et al., 2013). These combined data can be used to communicate to the consuming public the true (positive) value of trees in the landscape.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据