An exploration into cost-influencing factors on construction projects

期刊

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
卷 32, 期 5, 页码 850-860

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ijproman.2013.10.003

关键词

Cost-influencing factors; Cost control; Modified Delphi Method; KJ method

向作者/读者索取更多资源

Construction cost overrun is a common problem in construction industries. The objective of this research is to extract the key cost-influencing factors with new concept and methods to help control the expenditure. Hence, this research adopts the Modified Delphi Method (MDM) with 2 groups and 2 rounds and Kawakita Jiro method (KJ) to consolidate the experts' opinions and identify and rank the key factors that affect project costs. Ninety cost-influencing factors are collected from literary review and interviews with experts with practical cost control experiences in the construction companies (Group 1). The KJ method is used to consolidate these factors into 4 categories and down to a total of 42 factors. 2 rounds of questionnaires are then conducted to filter the key factors. In order to verify views of those in the first group, Group 2 consists of experienced experts from the public sectors, consulting firms and construction companies as a comparison. Results of the analysis indicate that there are 16 key cost-influencing factors. Severity Index computation was then adopted to rank these key cost-influencing factors. The study renders that clearly defined scope of project in the contract and cost control are the major determinants for cost overrun. (C) 2013 Elsevier Ltd. APM and IPMA. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据