3.8 Proceedings Paper

Construction Technology of Jiu-Jiang Yangtze River Highway Bridge

期刊

出版社

TRANS TECH PUBLICATIONS LTD
DOI: 10.4028/www.scientific.net/AMM.501-504.1274

关键词

long span cable-stayed bridge; hybrid girder; steel box girder; construction technology; vibration control

向作者/读者索取更多资源

Jiu-Jiang Yangtze River Highway Bridge, with a main span of 818m, is another long span hybrid girder cable-stayed bridge which connects Jiang Xi province and Hu Bei province in China. Steel box girder is adopted in main span and north side span, and main girder of south side span and south tower nearby is designed of concrete box girder. The pylon is concrete structure, with the height of 242.3m and H-shape. There are 216 cables used in this bridge, of which are assembled by parallel strands. Jiu-Jiang Yangtze River Highway Bridge began to construct in 2009, and was closed in December, 2012. The bridge opened to traffic officially in the next year. Design concept, construction method and vibration control measures about Jiu-Jiang Yangtze River Highway Bridge are introduced in this article.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据