4.7 Article

Productivity modelling of a developed inclined stepped solar still system based on actual performance and using a cascaded forward neural network model

期刊

JOURNAL OF CLEANER PRODUCTION
卷 170, 期 -, 页码 147-159

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.jclepro.2017.09.092

关键词

Solar still; Solar desalination; Productivity; ANN; Prediction; Modelling; Performance evaluation

资金

  1. Universiti Kebangsaan Malaysia [GUP-2016-020]

向作者/读者索取更多资源

This paper presents a cascaded forward neural network model for predicting the productivity of a developed inclined stepped solar still system. The actual recorded data of the developed inclined stepped solar still system is used to develop the proposed model. The results of the predicted productivity are compared with that obtained from regression and linear models. In this study, three statistical error terms are used to evaluate the proposed model: root mean square error (RMSE), mean absolute percentage error (MAPE) and mean bias error (MBE). The results show that the proposedcascaded forward neural network (CFNN) model more accurately predicts the productivity of the system than the other modelsmentioned. The RMSE, MAPE and MBE values of the proposed model are 22.48%, 18.51% and -26.46%, respectively. Therefore, the CFNN model provides benefits for modelling the solar still. (C) 2017 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据