4.4 Article

Improvement of railway ballast maintenance approach, incorporating ballast geometry and fouling conditions

期刊

JOURNAL OF APPLIED GEOPHYSICS
卷 151, 期 -, 页码 263-273

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.jappgeo.2018.02.020

关键词

Railway; Assessment technique; Quality index; GPR; Ballast; Maintenance planning

向作者/读者索取更多资源

Ballast plays an important role in the stability of railway track systems. The effectiveness of the ballast in maintaining the track stability is very much dependent on its mechanical conditions. The available ballast maintenance approaches are mainly based on only track geometry conditions (such as track profile) which do not sufficiently reflect the ballast mechanical behaviors. That is, the ballast potential of degradation (i.e., ballast long term behaviors) has been omitted. This makes the effectiveness of the current ballast maintenance approach questionable, indicating a need for a more comprehensive and effective ballast conditions assessment technique. In response to this need, two ballast condition indices based on ballast geometry degradation (BGI) and the level of ballast fouling (BFI) as the main indicators of ballast mechanical behavior were developed. The BC! is a function of the standard deviations of track alignment, unevenness and twist. The BFI was developed based on the data obtained from the ground penetration radar (GPR). Making use of the new indices, a more reliable maintenance algorithm was developed. Through illustrations of the applicability of the new maintenance algorithm in a railway line, it was shown that the new algorithm causes a considerable improvement in the maintenance effectiveness and an increase in the life cycle of railway tracks by making more effective allocation of resources and more accurate maintenance planning. (C) 2018 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据