4.7 Article

Removal of geosmin and 2-methylisoboneol (2-MIB) by membrane system combined with powdered activated carbon (PAC) for drinking water treatment

期刊

JOURNAL OF WATER PROCESS ENGINEERING
卷 4, 期 -, 页码 91-98

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.jwpe.2014.09.006

关键词

slurry blanket; Membrane hybrid process; Geosmin; 2-Methylisoborneol; Powdered activated carbon (PAC)

资金

  1. Korea Water Resources Corporation (K-water)
  2. Membrane Society of Korea

向作者/读者索取更多资源

Adsorption kinetic tests and step-feeding tests were performed to evaluate adsorption characteristics of geosmin and 2-methylisoborneol (2-MIB). Removal efficiencies of each unit process in powdered activated carbon (PAC) membrane hybrid system were evaluated as well. The hybrid system consists of two unit processes; a coarse powder activated carbon (C-PAC) contactor and a submerged membrane tank. A pilot plant having a capacity of 500 m(3) day(-1) was installed in W municipal drinking water treatment plant. C-PAC contactor has C-PAC (80-150 mesh) slurry blanket with a high concentration of 30,000 mg L-1 and the blanket is maintained in the contactor without loss. After the adsorption capacity of the C-PAC was exhausted, C-PAC turned into a biological activated carbon. In step feeding tests, 2-MIB and geosmin were continuously injected to the raw water as a concentration of 50 ng L-1 for 2-MIB and 200 ng L-1 for geosmin. Addition of fresh PAC of 15 mg L-1 and 5 mg L-1 was required to reduce the concentration of 2-MIB or geosmin below odor threshold concentration, respectively. These values are less than half of required dose from kinetic tests. The removal of Geosmin and 2-MIB by the bio-film formed on the C-PAC in the contactor was accounted for approximately up to 25% of the overall removal. As the raw water temperature increased from 5 to 20 degrees C, the biological removal efficiency was almost doubled. The operating pressure of membrane had been stable when the flux was maintained below 33 L m(-2) h(-1) with recovery rate of 98% for three months. The recovery cleaning is expected every 6 months for the long term operation. (C) 2014 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据