4.7 Article

Gantry crane scheduling in intermodal rail-road container terminals

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 56, 期 16, 页码 5419-5436

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2018.1444812

关键词

intermodal container terminals; gantry cranes; scheduling; mixed integer linear programming; fix-and-optimise

向作者/读者索取更多资源

Modern rail-road container terminals serve as important consolidation nodes in intermodal transportation networks where containers are transferred between freight trains and trucks. Among the most important decision problems in these yards is the crane scheduling problem, which decides on the sequences of container moves executed by each of the parallel gantry cranes. This paper treats a rich crane scheduling problem, which considers plenty relevant constraints and is directly applicable in Chinese intermodal terminals. For solving this problem, we propose a fix-and-optimise procedure, which is easy to implement and shown to successfully solve even large-sized instances with 100 container moves in reasonable time.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据