期刊
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 56, 期 16, 页码 5495-5510出版社
TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2018.1470345
关键词
assembly cell; cell loading; operator assignment; product sequence; task transfers
This research deals with an operator assignment problem in which cell loading and product sequencing are taken into account in labour-intensive assembly cells. In each cell the number of assembly tasks is more than the number of operators, so multi-assembly tasks are assigned to each operator. Because the assembly procedure and time required for each assembly task are quite different for different products, some tasks will be transferred when the product changes. Reducing the number of task transfers can smooth the process of product change. A four-phase methodology is proposed to minimise the total manpower required and task transfers at the same time. The four phases are manpower configuration design, calculating the number of task transfers, manpower requirement minimization and cell loading and product sequencing optimization. A case study from a bicycle assembly company is introduced. For comparison, two methodologies are applied. The results show that the proposed four phase methodology can provided the solution with fewer task transfers based on the same total manpower requirement. However, when the number of products increases, the computation time of the proposed four-phase methodology increases rapidly.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据