4.7 Article

Techno-economic assessment of the novel gas switching reforming (GSR) concept for gas-fired power production with integrated CO2 capture

期刊

INTERNATIONAL JOURNAL OF HYDROGEN ENERGY
卷 43, 期 18, 页码 8754-8769

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.ijhydene.2018.02.076

关键词

Pre-combustion CO2 capture; Gas switching reforming; Natural gas combined cycle power; plants; Techno-economic analysis

资金

  1. European Commission [604656]
  2. NanoSim project

向作者/读者索取更多资源

The focus of this study is to carry out techno-economic analysis of a pre-combustion capture method in Natural Gas based power plants with a novel reactor concept, Gas Switching Reforming (GSR). This reactor concept enables auto thermal natural gas reforming with integrated CO2 capture. The process analysed integrates GSR, Water Gas Shift (WGS), and Pressure Swing Adsorption (PSA) into a Natural Gas based combined cycle power plant. The overall process is defined as GSR-CC. Sensitivity studies have been carried out to understand the performance of the GSR-CC process by changing the oxygen carrier utilization and Steam/Carbon ratio in GSR. The net electrical efficiency of the GSR-CC lies between 45.1% and 46.2% and the levelised cost of electricity lies between 124.4 and 128.1 $/ MWh (at European natural gas prices) for the parameter space assumed in this study. By eliminating the WGS step from the process, the net electrical efficiency improves to 47.4% and the levelised cost of electricity reduces to 120.7 $/MWh. Significant scope exists for further efficiency improvements and cost reductions from the GSR-CC system. In addition, the GSR-CC process achieves high CO2 avoidance rates (>95%) and offers the possibility to produce pure H-2 during times of low electricity demands. (C) 2018 Hydrogen Energy Publications LLC. Published by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据