4.4 Article

Short-circuit-constrained transmission expansion planning with bus splitting flexibility

期刊

IET GENERATION TRANSMISSION & DISTRIBUTION
卷 12, 期 1, 页码 217-226

出版社

INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-gtd.2017.0615

关键词

power transmission planning; power transformers; substations; integer programming; linear programming; power transmission lines; short-circuit-constrained transmission expansion planning; bus splitting flexibility; TEP models; transmission lines; power transformers; generating units; substations; flow path impedances; short-circuit level constraints; bus splitting decision variables; nonlinear terms; mixed-integer linear programming; 24-bus reliability test system

向作者/读者索取更多资源

Incorporation of the short-circuit level constraints in the transmission expansion planning (TEP) has a direct impact on the final solution. Conventionally, in TEP models, a substation is tackled as a single node where are all transmission lines, power transformers, and generating units are connected to each other. However, bus splitting is a common option in most substations that divides the connected elements into two groups. Doing so, bus splitting can alter the flow path impedances and accordingly manage the short-circuit levels. Here, the short-circuit level constraints are modelled in terms of conventional TEP and bus splitting decision variables. The modelling process is very complex and some non-linear terms appear in the models. To have a tractable model in real-world problems, the non-linearities are converted to linear equivalents making the final TEP model conforming the mixed-integer linear programming format. The performance of the proposed model is examined on the 24-bus reliability test system. The results show that incorporation of the bus splitting option in the TEP problem decreases the total cost of the optimal expansion plan.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据