3.8 Proceedings Paper

Water-gas shift (WGS) operation of pre-combustion CO2 capture pilot plant at the Buggenum IGCC

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.egypro.2014.11.215

关键词

Pre-combustion CO2 capture; pilot plant; WGS section; reactor model; lowered steam/CO ratio; optimization

向作者/读者索取更多资源

In the Nuon/Vattenfall CO2 Catch-up project, a pre-combustion CO2 capture pilot plant was built and operated at the Buggenum IGCC power plant, the Netherlands. The pilot consist of sweet water-gas shift, physical CO2 absorption and CO2 compression. The technology performance was verified and validated models were obtained. This paper describes the validation of a WGS reactor model and the excellent catalyst resistance to carbiding at steam/CO=1.5 mol.mol(-1) testing. Model-based optimization shows that compared to conventional operation at steam/CO=2.65, applying steam/CO=1.5 leads to a 10% lower CO2 capture penalty of 1155 MJ(electric).tCO(2)(-1), albeit at a decreased optimum CO2 capture efficiency of 78.5% versus 87.5%. (C) 2014 The Authors. Published by Elsevier Ltd.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据