4.7 Article

Multi-Stage Stochastic Programming With Nonanticipativity Constraints for Expansion of Combined Power and Natural Gas Systems

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 33, 期 1, 页码 317-328

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2017.2701881

关键词

Multi-stage stochastic programming; nonanticipacivity constraints; natural gas and power network expansion co-planning; scenario tree; sequential decision making

资金

  1. National Key Basic Research Program of China [2016YFB0901904]
  2. National Natural Science Foundation of China [51607137]
  3. China Postdoctoral Science Foundation [2015M580847]
  4. Natural Science Basis Research Plan in Shaanxi Province of China [2016JQ5015]
  5. State Key Laboratory of Electrical Insulation and Power Equipment, Xi'an Jiaotong University [EIPE16301]

向作者/读者索取更多资源

A novel multi-stage stochastic programming model is proposed for the expansion coplanning of gas and power networks considering the uncertainties in net load demand. Meanwhile, the nonanticipativity constraints are taken into account to guarantee the decisions should only depend on the information of realized uncertainties up to the present stage. Compared with the traditional two-stage stochastic programming model, the proposed multi-stage stochastic programming model yields sequential investment decisions with the uncertainties revealed gradually over time, such that the investment decisions are capable of keeping future options open and can shift from never be changed decisions to a flexible wait and see decisions. The test on three systems shows the effectiveness of the proposed multi-stage stochastic programming model.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据